Questions about Rocky Forge Wind

Why wind energy?

Wind energy is among the fastest-growing new sources of energy. In 2015, wind energy was the number-one source of new electricity in the United States, accounting for more than 35% of all new generating capacity. Nationwide, wind now provides about 5% of our electricity. As wind technology and knowledge about wind resources both improve, more and more areas are becoming viable for wind energy. This includes Virginia, where the Rocky Forge Wind site has one of the strongest wind resources in the Commonwealth. 

 

Why is Apex the right company for this project?

Apex installed more wind energy capacity than any other company in the United States in 2015. We also have the largest pipeline of projects in the country, and our management team has facilitated thousands of megawatts of wind energy projects. We strive to always work toward developing the best possible projects for local communities and landowners. Rocky Forge is especially important to us. As a Charlottesville-based company, we are committed to helping Virginia realize the environmental and economic development benefits of clean energy generation from projects such as Rocky Forge.

 

Where is the Rocky Forge Wind project located?

Rocky Forge Wind is located on private land in a remote section of northern Botetourt County, several miles northeast of Eagle Rock along a southern segment of North Mountain. It’s also about 7 miles southeast of Iron Gate, 15 miles northeast of Fincastle, and 11 miles from Buchanan and Natural Bridge. A map of the project location can be found here.

 

What makes this location suitable?

This particular location is suitable for a number of reasons: It has a strong wind resource, based on verified on-site wind data; it already has an existing high-voltage power line that traverses the project site, which limits our need to construct new lines; and it is part of an expansive tract of over 7,000 acres of private land that provides more than a mile of buffer from its nearest neighbor. 

 

How big is the project?

Rocky Forge Wind will consist of up to 25 wind turbines. Each turbine can produce enough electricity to power between 600 and 900 homes, meaning that this project could provide the amount of electricity needed to power all the homes in Botetourt County. 

 

Can the project really produce that much electricity?

Our projection of up to 20,000 homes powered annually by Rocky Forge Wind was calculated using the wind resource data collected onsite and capacity factor of the turbines. Any capacity factor listed by the regional transmission organization, PJM, is based on a generic formula that is in use throughout its entire grid, and we have confirmed through extensive study that our projections are appropriate. The ability of the area transmission line to handle the full power from the project is documented in PJM’s study of the project, which confirmed that our point of interconnection and the area transmission lines are fully capable of handling the entire project load. Studying transmission infrastructure and electricity production is often very technical, but we are confident that our electricity projections and the ability of Rocky Forge Wind to deliver the claimed amount of power.

 

The calculation for this projected number of homes powered is as simple as:

 math.PNG

 

When will you know whether you have approval to construct the project?

At this early stage of development, we are focusing on conducting the necessary studies and engineering for county, state, and federal permitting. We hope to begin delivering clean power to the Virginia electric grid in 2018. 

 

How big are these wind turbines?

Modern wind turbines have to be big enough to efficiently capture large amounts of wind energy and convert it into clean electricity for our homes and businesses.

 

Modern wind turbines that are suitable for this location consist of tower heights roughly 350 feet tall and with an overall blade tip height of approximately 550 feet. These are low-RPM turbines, taking three to four seconds to complete one revolution, with redundant safety systems to withstand extreme weather conditions. 

 

Will the turbines require lighting?

No white strobe lights will be used on the turbines. The wind farm will employ the minimum number of standard nighttime red strobe lights as required by the Federal Aviation Administration (FAA) for the safety of passing aircraft.

 

Will this project affect my electric bill?

Electricity rates are set by the State Corporation Commission, and Rocky Forge Wind will have to demonstrate that it can provide electricity at competitive rates before it can be added to ratepayers’ electricity supply. In today’s energy environment, wind acts as a stabilizing force. Because the fuel for wind energy is free, the technology provides a long-term hedge against volatile fuel prices, and in some areas, wind is currently—on an unsubsidized basis—the lowest-cost form of new electricity, saving ratepayers money. 

 

Will this project be subsidized?

Rocky Forge Wind will be developed and built through private investment. It’s important to note that all forms of energy are incentivized in some fashion. The most commonly applied tax credit for wind energy is called the production tax credit (PTC). The PTC is a tax credit for only the verified production of electricity during the first 10 years of a project’s 30-year operational life. Therefore, there is no PTC involvement in the project until it becomes operational.

 

Who will maintain the facility?

Depending on who purchases the power, the buyer may maintain the facility, but more likely, Apex Clean Energy will take on the long-term operation of the wind project. The operations and maintenance would be performed by a handful of local employees as well as the staff at our remote operations control center in Charlottesville, Virginia.

 

What about decommissioning?

Under the requirements of Botetourt County’s Wind Energy Ordinance, any wind project developer must provide financial security to cover decommissioning costs for the project. This security ensures that funds are always available to remove the wind farm in the event of a worst-case scenario.